FacilityBot logo
FacilityBot
Create
Roadmap
Feedback
Feature Requests
Changelog

    Boards

  • Feature Requests

Powered by Canny

Feature Requests

[Requests][Timesheets] To link Requests to Timesheets directly
Currently there's no way to directly link existing request to Timesheets.
3
·
Timesheets
·
planned
[Timesheets] Include Total Duration Column
Add a “Total Duration” column that automatically calculates and displays the time spent between: Start Time → End Time [WNS]
2
·
Timesheets
·
planned
Powered by Canny